💼 Audit Service ▸ STATUS.md
updated 2026-07-23

Stream A — AI Ops Audit (“KI-Betriebs-Check”) — STATUS

Final pass complete 2026-07-15 ~00:15. Launch-ready. Nothing deployed, sent, posted, or purchased.

What was built

A complete sell-and-deliver kit for a fixed-price AI-operations audit for German SMEs, billed through MIA UG:

Council scores (R1 → R2)

R1 per-persona scores were not persisted to this stream (orchestrator context); R1 must-fix items were all applied before round 2. Round-2 average: 8.3/10.

Persona R2 score R2 must-fixes Status after final pass
BRANSON 8.5 Erstgespräch script missing; LinkedIn URL + og:url unverified on checklist Script added to OUTREACH.md (+ Phase -1 in playbook); both checklist lines added
MACKENZIE 8.0 Remote Google Fonts; no B2B/netto line on page; no invoice draft Fonts self-hosted (all 4 HTML files); B2B line DE+EN added; INVOICE-TEMPLATE.md created
VEGA 8.5 Guarantee copy mismatch in Message A; no week-2 distribution wave; LinkedIn/mailto unverified A fixed verbatim per VEGA (+ A-EN/B/C/D aligned); Week 2 wave written (DM batch, post H, IHK message I); checklist lines added
SHADE 8.0 OG image in Helvetica fallback; remote fonts; nav overflow on mobile OG regenerated in real Outfit w/ base64 fonts + rebalanced dot; fonts self-hosted; ≤640px media query added and verified (375px scrollWidth 360 — no overflow)

All R2 must-fixes: applied tonight

  1. Erstgespräch script — OUTREACH.md new section: 3 qualifying questions (processes/segment, who signs off on €990, success criterion), 2-sentence pitch, verbal guarantee, exact close into template G. DELIVERY-PLAYBOOK gained Phase -1 referencing it.
  2. Fonts self-hosted — Outfit + JetBrains Mono woff2 (latin, variable weight) downloaded to fonts/; @import + preconnect removed from index/impressum/datenschutz/report-template; Datenschutz section 4 deleted, sections renumbered. Verified: zero googleapis/gstatic references remain.
  3. B2B/netto disclosure — DE line under price card (“…ausschließlich an Unternehmen im Sinne des § 14 BGB (B2B)”), EN mirror in the #english price card.
  4. INVOICE-TEMPLATE.md — § 14 UStG field checklist, copy-paste line item (€ 990,00 + € 188,10 USt. = € 1.178,10, zahlbar sofort, Leistungszeitraum Kickoff + 5 Werktage), Stornorechnung/§ 17 UStG refund mechanics, E-Rechnung note (PDF fine until 2027/28).
  5. Guarantee copy unified — Message A now verbatim: “…nicht mindestens drei Automatisierungen mit zusammen 10.000 € Einsparpotenzial pro Jahr, erhalten Sie den vollen Betrag zurück.” A-EN, B, C, D aligned to the same 3-automations/€10k-combined/full-refund mechanics (matches page + template G).
  6. Week 2 wave — scripted: (a) day 5 = PROSPECTS rows 11–15 get B/C; (b) second LinkedIn post H drafted (AI-Act-deadline hook + “first findings” variant); (c) IHK Berlin / Mittelstand-Digital-Zentrum channel with drafted Message I; fallback = Message D into 2 more communities.
  7. OG image regenerated — fonts base64-embedded in og-image.src.html (headless Chrome can never fall back), dot gradient rebalanced so opal #56dbd0 carries the first ~34% of the sweep; PNG visually verified: headline unmistakably Outfit, meta line in JetBrains Mono.
  8. Responsive nav — ≤640px: anchor links hidden except Preis + EN toggle, hero/price-card padding tightened. Measured in a true 375px viewport: document scrollWidth 360px, no horizontal overflow. (Note: earlier “overflow” screenshot was a headless-Chrome artifact — it clamps window width to 500px and crops.)
  9. Verification checklist hardened (README) — added: LinkedIn URL opens YOUR profile (both page links + OUTREACH.md), og:url/og:image tested with LinkedIn Post Inspector before posting A, mailto umlauts intact in Mail.app, fonts load locally (no fonts.googleapis.com in DevTools).

Unresolved (needs Joshua — cannot be done by an agent tonight)

Month-one revenue math

MORNING ACTIONS (final list — details + copy in README.md)

  1. Confirm €990-public price decision (2 min)
  2. Create Cal.com booking link; swap into 3 CTAs + OUTREACH messages (10 min)
  3. Fill Impressum/Datenschutz placeholders (5 min)
  4. Add photo to bio block (5 min)
  5. Preview page; set real og:url/og:image once deploy path known
  6. Deploy index.html, impressum.html, datenschutz.html, og-image.png, fonts/ to .deploy/audit/, commit, push
  7. Run the README verification checklist (incl. LinkedIn links, Post Inspector, mailto umlauts, local fonts)
  8. Fill PROSPECTS.md (15 rows) BEFORE opening LinkedIn (15 min)
  9. LinkedIn: post Message A + A-EN comment (15 min)
  10. DMs: B/C to top 10 qualified rows; log dates (45 min)
  11. Slack communities: Message D where rules allow (15 min)
  12. Masawa orbit: 3–5 unambiguous personal relationships, Message E — or park
  13. Invoice prep from INVOICE-TEMPLATE.md (10 min)
  14. Day 5 (pre-scripted, no thinking): Week 2 wave — rows 11–15, post H, IHK Message I